Charlotte Convention Center

March 4, 2013

Charlotte, NC

LEO 23GT at the Charlotte Convention Center

Don Doster Painting was contracted to perform ceiling repairs to the Charlotte Convention Center with the challenge to complete the project quickly, professionally and on a tight budget. The primary challenge being that the ceiling was 61' from a second floor mezzanine and set up had to be established adjacent to both an escalator and a set of stairs.  Scaffold was not acceptable due to cost (over $30,000) and time constraints (would have extended the project to 7 days).  A traditional boom was not usable because of floor load limits and the only access was through standard double doors or a 10000lb freight elevator.

"Scaffold was our other best choice and we could not have completed the project in the timeframe allowed by the Convention Center.  With the Leo 23GT, we were able to complete the job in two full shifts and at a fraction of the cost."  - Donnie Doster

Posted in Success Stories.

Post a comment (* required field)

Name *
Email * (will not be published)
Website
Comments *