University of Texas

San Antonio, TX Universities are regularly faced with access challenges in many on campus buildings. In addition to dimensional and weight access issues, many campuses face tight time constraints. It's not easy for Facility Manager's to find a solution that won't interfere with everyday Read More >

Church of Charlotte

Charlotte, NC
Facility maintenance at this new church had been a challenge from the first day the church opened. Dealing with small issues most buildings encounter when they are first turned over to the owner can be very challenging. Not knowing what problems you are going to face Read More >

Canadian Museum of Human Rights

Winnipeg, Manitoba During construction, the steel erectors required lifts that could be craned into the museum interior and be set up on elevated floor slabs. Floor loading was the primary concern as the workers needed to reach heights from 60' to 95' above each floor level to tie-in and Read More >

Charlotte Convention Center

Charlotte, NC Don Doster Painting was contracted to perform ceiling repairs to the Charlotte Convention Center with the challenge to complete the project quickly, professionally and on a tight budget. The primary challenge being that the ceiling was 61' from a second floor mezzanine and set up Read More >

Museum Facilities Manager Makes the Most of a Teupen Lift

A Feature in the Publication Industrial Lift & Hoist

Andy VanHouten, facilities manager at the Strong Museum, Rochester, N.Y., rented a Teupen LEO15GT Plus compact tracked lift to do a variety of maintenance work on the 300,000-square-foot facility. During a week-long rental, he Read More >

Museum of Human Rights

During construction, the steel erectors required lifts that could be craned into the museum interior and be set up on elevated floor slabs. Floor loading was the primary concern as the workers needed to reach heights from 60' to 95' above each floor level to tie-in and connect steel support Read More >

« Newer Posts